Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 84042 REL 86: 2010-001-00 EXP WDFW FISH SCREENS - MVID & TWISP POWER
Project Number:
Title:
Upper Columbia Programmatic Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 25.00%
Methow 25.00%
Okanogan 25.00%
Wenatchee 25.00%
Contract Number:
84042 REL 86
Contract Title:
2010-001-00 EXP WDFW FISH SCREENS - MVID & TWISP POWER
Contract Continuation:
Previous: Next:
84042 REL 53: 2010-001-00 EXP UC - WDFW FISH SCREEN PROGRAMMATIC
Contract Status:
Issued
Contract Description:
This third contract year of the programmatic agreement between the BPA and the WDFW is continuing significant improvements in fish protection in the upper Columbia watersheds by bringing existing fish screen facilities into compliance with federal and Washington State fish screening and passage standards. The WDFW identified eight projects (Buttermilk, MVID East, Skyline, Twisp Power, Maltais, Tandy, Rocky reach pool pump screen inventory, and the Entiat River Pump Screen) as being at the top of WDFW's list for correction to protect Spring Chinook and steelhead populations.

The sponsors will continue to implement a phased approach to correcting the respective issues at each of these project locations using a logical, sequential, and strategized approach that includes diligent communication with BPA, local experts, and water users. WDFW will continue working closely in partnership with the Methow Salmon Recovery Funding Board (MSRF), local entities, landowners, water users, and the Upper Columbia Salmon Recover Board (UCSRB).

WDFW completed the Buttermilk, Tandy, and Entiat pump screen projects, and produced engineered designs for the Skyline, Maltais, MVID, and Twisp Power projects in the first and second year of funding. Under this agreement WDFW will complete the MVID East and Maltais diversion projects as deliverables. Construction for the MVID project will begin summer 2024 and be completed after irrigation shutdown fall 2024. Twisp Power will be completed after irrigation shutdown fall 2024. WDFW will continue to analyze the diversions identified while conducting a boat-based survey of the Rocky Reach pool and work with Ecology staff in a collaborative effort to achieve landowner outreach and cooperation for screen improvements. WDFW will work with local partners in the future to complete a prioritized correction plan based on likelihood of impact to fish life, diversion volume, location, and landowner willingness. In an addition to this contract, WDFW will help purchase compliant fish screens for the Aeneas Lake Irrigation District to replace their failing 12cfs pump screens in the Okanogan River.
Account Type(s):
Expense
Contract Start Date:
10/01/2024
Contract End Date:
09/30/2025
Current Contract Value:
$430,445
Expenditures:
$32,993

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Completed environmental compliance clearance B: 165. Obtain Required Permits, Authorizations, and Documentation 04/30/2025
Effective implementation management and timely contract administration C: 119. Manage BPA Contracting Requirements 09/30/2025
Maintain communication with MSRF and UCSRB D: 191. Coordinate with regional and local project partners including MSRF & UCSRB 09/30/2025
Complete Twisp power project E: 208. Twisp Power Construction 12/31/2024
Complete MVID Construction F: 208. MVID Construction 12/31/2024
Rocky Reach Pool landowner outreach and screen improvements identified G: 115. Rocky Reach Pool Pump Screen Inventory Scoping and Outreach 09/30/2025
Purchase 12cfs Pump screens H: 208. Okanogan River Pump Screens - Aeneas Lake Irrigation District 04/30/2025
Annual report details provided to UCSRB I: 132. No Report to BPA Required per COR -- Summary to UCSRB 11/30/2024

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 208 Irrigation Infrastructure Construction or Replacement
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 208 Irrigation Infrastructure Construction or Replacement
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 3 instances of WE 208 Irrigation Infrastructure Construction or Replacement
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 208 Irrigation Infrastructure Construction or Replacement

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Obtain Required Permits, Authorizations, and Documentation
C 119 Manage BPA Contracting Requirements
D 191 Coordinate with regional and local project partners including MSRF & UCSRB
E 208 Twisp Power Construction
F 208 MVID Construction
G 115 Rocky Reach Pool Pump Screen Inventory Scoping and Outreach
H 208 Okanogan River Pump Screens - Aeneas Lake Irrigation District
I 132 No Report to BPA Required per COR -- Summary to UCSRB